Kempinski Summerland
Scope
1. Preliminary drawings
2. Client approval on design
3. Site dimensions
4. Shop drawings/fabrication drawings
5. Structural study
6. Material order
7. Site supervision
8. Handing over
Note:
Steel and glass panels were ordered at the same time
2. Client approval on design
3. Site dimensions
4. Shop drawings/fabrication drawings
5. Structural study
6. Material order
7. Site supervision
8. Handing over
Steel and glass panels were ordered at the same time